Signal Repeater Amplifier Booster Installation Notice

Site Survey

Before you install Signal Repeater Amplifier Booster, the installer should contact the person responsible for the project, understand whether there are installed conditions in the installation site.

Specifically include: Installation site, surroundings (Temperature and Humidity), power supply, and so on. If qualified, should go live on-site survey with related personnel. The repeater is designed that can working outdoors, operating temperature is -25oC~65oC, humidity is ≤95%, which can be adapted to most areas of the natural environment.

Recommended Environmental Requirements:

1.Installation area non-corrosive gases and fumes, Electromagnetic interference field strength ≤140dBμV/m(0.01MHz~110000MHz).
2.Mounting height should facilitate the RF cable routing, cooling, safety and maintenance.
3.Should provide a set of independent and stable 150VAC~290VAC(Nominal 220V/50Hz)AC Power. It must not be shared with other high-power appliances telecommunications equipment.
4.Lightning protection devices must be installed in the building, and it should have sufficient strength and stability.
5.There are grounding bar in the vicinity.

Installation Tools

Installation tool to use: Electric impact drill, iron hammer, pulleys, ropes, belts, helmets, ladders, screwdriver, hacksaw, knife, pliers, wrenches, compass, measuring tape, tweezers, electric iron, portable PC, 30dB directional coupler, spectrum analyzers, VSWR tester.

Signal Repeater Amplifier Booster installation

It can be holding pole or wall mounting way. It should be installed in ventilated place, vertically on a wall or mast to ensure good heat dissipation, if hang on the wall, the upper part of the equipment to be considered more than 50cm from the ceiling, the lower part of the equipment needs more than 100cm from the floor.

Antenna and Feeder Installation and Precautions

1.Installation of antenna systems requires experienced professionals to complete.
2.You can not install an antenna near power lines, which may be life-threatening.
3.All exposed joints must use self-adhesive waterproof tape and electrical insulation tape seal securely.

Connect the Ground and Power Supply

1. Equipment Grounding
The equipment must be well grounded, there is a copper on the repeater wall chassis ground, use 4mm2 or thicker copper wire close to the ground. Grounding wire should be as short as possible. When installed, the equipment grounding wire should be connect to the integrated grounding bar. Grounding resistance of requirements bar may be≤ 5Ω, ground connector require preservative treatment.
2. Connect the Power
Connect 220V/50Hz AC power to the equipment power port terminal blocks, power line use 2mm2 cables, length less than 30m. For standby power requirement, the power must go through UPS, and then connect the UPS to the repeater power port terminal blocks.

For more details,feel free to contact us!